BC Hydro Calls for Power

1.5 TWh/yr more wind and solar in 2025, up 20% on 2024

Peace
South Interior
East and West
North Coast
Central Interior
Vancouver Island
2024 Call for Power
Awarded December 2024
Weighted average bid price of awarded contracts
$86/MWh
Evaluation price $83/MWh
0246810 TWh/yr 7.54.8 1.32.91.81.01.42.0 OfferedContracted
1.6×
Oversubscribed
28%
Won in the Peace
Participation
21
Received
10
Awarded
164MW
Average size
CEAP interconnection cost
79
Studies filed
$60M
Average per winner
$6.40 per MWh
$68M
Average per bidder
$9.80 per MWh
2025 Call for Power
Awarded May 2026
Weighted average bid price of awarded contracts
$95/MWh
Evaluation price $94/MWh
0246810 TWh/yr 9.03.5 2.02.82.61.61.91.6 OfferedContracted
2.6×
Oversubscribed
55%
Won in the Peace
Participation
14
Received
4
Awarded
290MW
Average size
CEAP interconnection cost
92
Studies filed
$40M
Average per winner
$2.70 per MWh
$113M
Average per bidder
$10.05 per MWh